Longer

Longer

.

.

.

Longer

The proposed Sandhills motoryway would be 1.5 km longer than SH-1 upgraded

This means a cumulative additional cost to all road users in extra fuel.

It will also make every journey an additional 1 minute 46 seconds longer.

Bothe tehse foact are from the GWRC traffic survey in 2005 and they are showin in the table below.

SH1-Expressway-LengthAndTimings

SH1-Expressway-LengthAndTimings

Comments are closed.