Longer
Longer
.
.
.
Longer
The proposed Sandhills motoryway would be 1.5 km longer than SH-1 upgraded
This means a cumulative additional cost to all road users in extra fuel.
It will also make every journey an additional 1 minute 46 seconds longer.
Bothe tehse foact are from the GWRC traffic survey in 2005 and they are showin in the table below.

